亚洲av日韩aⅴ无码精品,|熟女av三区|夜夜偷影視為你提供国产精品久久久久精品三级手機看片影視,亚洲AV大片在线观看一区二区三区,野花精品亚洲无码四区AV,日人人妻人人插|ab天堂在线

Company News
Jiyuan Jinyuan Chemical Co., Ltd. Second notice of the crude benzene hydrogenation expansion to 200,000 tons / year technical transformation project Environmental impact assessment
2018-05-11

Jinyuan Jinyuan Chemical Co., Ltd. crude benzene hydrogenation expansion to 200,000 tons / year technical transformation project entrusted Henan Metallurgical Research Institute Co., Ltd. to carry out environmental impact assessment, in accordance with the "Interim Measures for Public Participation in Environmental Impact Assessment", The environmental impact assessment of the project was publicized twice, and the opinions and suggestions of the public were widely sought.



  1. Project Overview

Jiyuan Jinyuan Chemical Co., Ltd. expanded the crude benzene hydrogenation to 200,000 tons / year technical transformation project investment of 15 million yuan, on the basis of the company's 100,000 tons / year crude benzene hydrogenation on the basis of transformation and expansion, hydrogenation unit increased pre-fractionation Tower, replace the circulating hydrogen compressor, replace the evaporator tube bundle, increase the catalyst loading of the main and pre-reactor, increase the pre-distillation tower and the solvent recovery tower by the extractive distillation unit, transform the existing toluene tower into a benzene tower, and replace the distillation tower with high efficiency. Tray, cancel the existing white clay tower. The auxiliary system changed the open cooling tower to a closed cooling tower to relocate the existing loading and unloading device and increase the loading and unloading position.

  1. Possible impacts of construction projects on the environment

The construction of this project does not involve environmentally sensitive areas such as nature reserves, scenic spots and natural history and cultural heritage. According to the planning of industrial clusters and the status quo of the regional environment, the main environmental protection targets of this project are the residents around the project area, surface water bodies, and groundwater and soil in the surrounding areas. The project has technical transformation of the existing production facilities, and the environmental impact during the construction period is small; the main environmental impacts during the operation period are the impact of process waste gas, production wastewater, equipment noise on the regional environment and surrounding residents, and environmental risks caused by tank leakage.

III. Countermeasures and measures for preventing or mitigating adverse environmental impacts

(1) Exhaust gas

1 The main reactor heating furnace and the rectification heating furnace are all fueled by the purified coke oven gas. The combustion products are mainly CO2, H2O, etc., which meet the requirements of GB16297-1996 "Integrated Emission Standards for Air Pollutants" Table 2 Value requirements, up to standard discharge.

2 Stabilization tower exhaust gas and safety valve exhaust gas are sent back to Jinma Energy Gas Purification Desulfurization Unit for desulfurization treatment;

3 gas strip vacuum pump exhaust gas, xylene rectification tower non-condensable gas sent to the hydrogenation furnace combustion treatment.

4 Each storage tank of the benzene oil storage tank adopts an internal floating roof trough method to prevent the escape of oil and gas in each storage tank, and the exhaust gas discharged from the exhaust pipe of the charging arm is concentrated and sprayed by washing oil, and is absorbed and discharged;

(2) Waste water

The project wastewater includes production wastewater, domestic sewage and circulating cooling wastewater. After collection, it is sent to Jinma Energy's existing phenol cyanide wastewater treatment station for treatment, and then used as a dry quenching cycle system to supplement water after advanced treatment.
(3) Solid wasteThe solid waste generated by the project is mainly the raw material evaporator evaporation residual liquid, the hydrogenation section waste catalyst, the solvent recovery regeneration tower residue, etc., the evaporation residual liquid and the solvent recovery regeneration tower residue are sent to the Jinma energy coal preparation workshop to be incorporated into the coking coal, the spent catalyst Recovered by the catalyst manufacturer.(4) NoiseThe project adopts noise reduction measures such as damping foundation, silencer and indoors for each high-noise equipment. The noise at the boundary of the plant can meet the requirements of the evaluation standard.
IV. Highlights of the evaluation conclusions presented in the Environmental Impact Report The construction of the project is in line with the national industrial policy. After the pollution prevention measures recommended by the evaluation are taken, the waste water, waste gas and noise can be discharged as standard, and all kinds of solid waste can be effectively disposed, which will not affect the surrounding environment and sensitive points. . The project's accident risk can be controlled to the extent currently acceptable under the requirements of the specification. Therefore, the evaluation considered the project to be environmentally viable.

?

  1. The specific form of seeking public opinions

The scope of this public comment is mainly for residents, relevant departments and experts around the site. The public may contact the construction unit to check the environmental impact report by telephone, fax, e-mail, website and letter within 10 working days from the date of publication of the announcement, and make comments or suggestions.  

  1. Contact information

Construction unit: Jiyuan Jinyuan Chemical Co., Ltd.

Contact: Minister Chen

Tel: 0391-6038009

Mail box: [email protected]

沙坪坝区| 博客| 舞钢市| 苏尼特左旗| 苗栗市| 内乡县| 全椒县| 邹城市| 荆州市| 抚顺市| 平安县| 句容市| 都匀市| 开原市| 咸阳市| 苍山县| 平阳县| 澄迈县| 汉沽区| 辽源市| 平度市| 高州市| 峨眉山市| 平罗县| 财经| 卓资县| 同江市| 土默特右旗| 焦作市| 孟津县| 棋牌| 黄大仙区| 平陆县| 新竹市| 新野县| 大化| 福泉市| 德清县| 紫阳县| 桂平市| 怀仁县|